nw construction prepared a bid for the mississippi job corps center mjcc to build a kitchen facility at a training center in preparing the b/

1. The appeals court held there was an enforceable promise. Since Hinson did not sign a contract and never received any payment from N&W, should Hinson be responsible? Why did N&W not get an agreement in writing?
2. Since the next bid was 50 percent higher than Hinson’s, is it likely that Hinson’s bid was poorly done, and that he would have suffered a big loss had he done the work?