Statistical Process Control Methods
NO PLAGIARISM, MUST BE ORIGINAL WORK!!!
THIS IS A 3 PART ASSIGNMENT AND ALL PARTS MUST BE DONE FULLY AND CORRECTLY.
1 WORD DOCUMENT, 1 EXCEL DOCUMENT AND 1 POWER POINT MUST BE COMPLETED AS EXPRESSED BELOW. POWER POINT MUST HAVE DETAILED SPEAKER NOTES INDICATING WHAT IS BEING PRESENTED. 2 OR 3 SENTENCES IS NOT ENOUGH.
MUST USE AT LEAST 1 IN TEXT CITATION WITH ALL REFERENCES LISTED IN APA FORMAT.
Select a complex continuous process from your personal work (GENERAL CONTRACTOR). The process can be the same as in Week 1 assignment.
Complete the following:
- Use Microsoft® Excel® to calculate the defined process metrics including variation and process capability.
- Use Microsoft® Excel® and PowerPoint® to develop and display a control chart for the process.
Evaluate the control chart and process metrics using Statistical Process Control (SPC) methods.
Evaluate whether the process could benefit from the use of Six Sigma tools.
Develop a 525-word executive summary in which you describe your Statistical Process Control project and include the control chart with SPC.
Format your assignment consistent with APA guidelines.

