Value Stream Mapping and Analysis

          1. Instructions
            For the Assignment, select a value stream in your organization that can benefit from analysis and
            improvement. As noted previously, the value stream (or end-to-end process) selected does not need to be
            overly large or complex. Select something which has the potential for meaningful improvement, but which is
            manageable within the scope of this assignment.

            1. 1) Develop a current state Value Stream Map of your selected value stream. Show the customer demand
              rate (or Takt), information flow, work flow, and summary timeline on the map.
            2. 2) Document key metrics for each process block:
              •  Process time (PT)
              •  Lead time (LT)
              •  Percent Complete and Accurate (%C&A)
              •  Include any other appropriate metrics, such as number of operators, changeover time or setup time, batch size, and % uptime.

        1. 3) Calculate the current state summary metrics:
          •  Total lead time (Total LT)
          •  Total process time (Total PT)
          •  Activity Ratio (AR)
          •  Rolled Percent Complete and Accurate (Rolled %C&A)
        2. 4) Describe the current state of the value stream and highlight any performance deficiencies and challenges,
          such as delays, excessive WIP, bottlenecks, capacity and workload imbalances, rework, poor quality
          yields, long lead times, and other operational issues.

        Submission RequirementsYour work may be submitted in either Word or PowerPoint.

        •  Since you will need to include a diagram to map the value stream for #1, you should select
          whatever software you are most comfortable working with. Value stream process maps can easily
          be created in PowerPoint, but are more difficult to execute well in Word. You should consider using
          https://www.draw.io/ which is a free web-based tool for drawing flowcharts. Instructions for use are
          posted in the Course Documents section in Blackboard. You may also use other software such as
          Visio if you prefer, but this is not necessary. Note: If you do use a different mapping software and
          experience difficulties uploading it into Blackboard, convert your map to a PDF or JPG and paste it
          into Word or PPT before submitting.
        •  For #2, the information for each process block should be on the value stream map. For #3, it can
          be on the map or in tabular form. Show how the summary metrics are calculated. Keep your
          written answers brief and to the point. Accuracy is what matters. This should take no more than
          one page. There are no additional points for overly elaborate responses.

         For #4, a thorough response should take no more than one page.