Work Breakdown Structure
There are multiple work breakdown structure formats and each has its own advantages and disadvantages. Project managers select a type of WBS based upon the specifics of the project they are managing. Each WBS format emphasizes different aspects of a project. These varied perspectives may each be appropriate, depending upon what information a project manager needs.
In this Discussion, you analyze different WBS formats and evaluate whether they meet basic criteria for clarity.
To prepare:
- Explore the Work Breakdown Structure Formats document included in this week’s Learning Resources. The document presents a scenario and three corresponding WBS formats that pertain to the scenario.
- Consider the advantages and disadvantages of each WBS format included in the document.
- Think about the level of detail dedicated to task information in each WBS format. Evaluate the formats based on the following criteria for clarity:
- The task has a measurable status or completion.
- The task has defined start and end events.
- The task has a deliverable.
- The task’s time and cost are easily estimated.
- The task can be completed without interruption and additional input after its start.
THEN
Post an analysis of the advantages and disadvantages of each work breakdown structure format. Provide an analysis of whether (and how) the work breakdown structures meet the assigned criteria for clarity. Provide rationale for your response.
Preferred References:
Biafore, B. (2010). Microsoft Project 2010: The missing manual. Sebastopol, CA: O’Reilly.
Coplan, S., & Masuda, D. (2011). Project management for healthcare information technology. New York, NY: McGraw-Hill.
Project Management Institute. (2013). A guide to the project management body of knowledge (PMBOK guide) (5th ed.). Newtown Square, PA: Author.

